The extension of the existing LNG terminal in the low-temperature unit in Sines also included the expansion of storage, regasification and receiving facilities. Lindner carried out insulation works on pipes and tanks on an area of approximately 8,500 m².
Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.