New Main Control Centre of TransnetBW

In only two years, a highly modern control centre for the power grid of Baden-Württemberg was constructed in Wendlingen am Neckar. This centre of the operator TransnetBW is responsible for controlling the power supply in Baden-Württemberg around the clock. Through this main control centre, TransnetBW prepares the way for the energy revolution while guaranteeing power supply for about eleven million people. The project required an investment volume of about € 50 mn; about 100 specialists work in this building.

Lindner AG contributed numerous works to the interior fit-out of the control centre. The performance area Floor Systems included large quantities of hollow floors; raised floors have been installed both as standalone areas and as channels through hollow floor areas. They were used whenever a heightened occurence of pipes and other installations in order to facilitate maintenance works. The scope of works also included Lindner Glass Partitions of the types Lindner Life Stereo 125 and Lindner Life Pure 620 with integrated absorbers for improved room acoustics. The hallways have been partially fitted with corridor ceilings of type LMD-E. The performance spectrum also included doors and gate systems, also with the specification for heightened security measures that wery required by the sensitive nature of this instrastructure project. In regard of the area steel construction, the project required complex custom constructions, particularly the accessible viewing screen of the control centre and several staircases.

img_de_transnet_19
img_de_transnet_4
img_de_transnet_11
img_de_transnet_2
img_de_transnet_1

General

Project: New Main Control Centre of TransnetBW

Building Type: Office buildings, Power Plants, Data Centres

Address: Ohmstraße 4

Zip/City: 73240 Wendlingen am Neckar

Country: Germany

Completion: from 2015 to 2017

Company: Lindner SE | Fit-Out South.Southwest Germany


Companies involved

Client: TransnetBW GmbH

Architect: WMA Wöhr Mieslinger Architekten


Products

Construction site equipment

Tiling works

Metalworks

Painting works

Floor covering works

Floors

Calcium sulphate panels

Nasshohlboden

CAVOPEX

Calcium sulphate panels

Dry lining

Plasterboard ceiling systems

Plasterboard partition systems

Partitions

Partition Systems Full Panel

Wall and ceiling panels


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.