The Quai Ouest is an office building in western Paris. It was erected in 1993, and after a 20-year usage period, it closed for refurbishment with new modern working enviroments. This project also brought substantial improvements in regard of the building´s environmental standard.
Lindner France SASU was contracted with the supply and installation of Heated and Chilled Post-Cap Ceilings of type Plafotherm® B 100 SD. Through their integrated heating and cooling technology, this system allows efficent temperature control even in open spaces. At the same time, the ceilings improve the rooms in regard of their acoustics, which is achieved with a perforation and a longitudinal sound insulation.