Johannes Gutenberg University Mainz

As part of ongoing construction work on the campus of the Johannes Gutenberg University, a new laboratory and office building was created for the Centre for Fundamental Physics (CfP II). In an initial construction phase, the existing underground experimental halls for the new particle accelerator MESA (Mainz Energy-Recovering Superconducting Accelerator) were already converted. The now realised four-storey building provides specialist laboratories and offices for six new research groups as well as for visiting scientists from various disciplines. The building structure includes a cleanroom, a neutron irradiation unit, and a heavy-duty assembly hall for the construction of detector units.

The Lindner Group was responsible for the complete fit-out of the CfP II laboratory and office building, bringing their expertise with a wide range of services: This included, among other things, the installation of heating, ventilation, and sanitary systems as well as all electrical engineering, including self-sufficient power supply and lighting systems.

In the field of object design and building technology, Lindner provided specialised solutions. These included high-quality wooden interior doors and a ventilation technology that ensures optimal air purification and circulation, which is of particular importance in sensitive areas. 

The expansion of cleanrooms and laboratories represented another core competence of the Lindner Group: In the laboratories airlock, wall, and ceiling systems were installed that meet the highest cleanroom standards and ensure a contamination-free environment. Integrated LED lights in the cleanroom ceilings provide optimal lighting and working conditions.

The comprehensive range of services offered by the Lindner Group is rounded off by drywall and flooring works, as well as painting, and screed works.

img-de-JGU-Mainz-CFP2-04
img-de-JGU-Mainz-CFP2-25
img-de-JGU-Mainz-CFP2-03
img-de-JGU-Mainz-CFP2-07

General

Project: Johannes Gutenberg University Mainz

Building Type: Office buildings, Research Rooms, Laboratories and Research Facilities

Address: Fritz-Kohl-Straße 9

Zip/City: 55122 Mainz

Country: Germany

Completion: 2023

Company: Lindner SE | Fit-Out Central.East Germany, Lindner SE | Building services engineering, Lindner SE | Clean Rooms, Lindner SE | Interior Fit-Out and Furnishings, Lindner Isoliertechnik & Industrieservice GmbH


Companies involved

Client: Landesbetrieb Liegenschafts- und Baubetreuung (LBB-Mainz)

Architect: DGI Bauwerk, Berlin


Products

Building services engeneering

Ventilation technology

Electrical engineering

Heating system

Measurement, control and regulation technology

Clean Room

Partition systems 50

Partition systems 100

Aluminium grid systems

Steel grid systems

Integrated lights

Doors

Wooden doors

General Contracting

Dry construction works

Carpentry

Tiling works

Painting works

Floor covering works

Metalworks

Screed works

Plastering works

Cleaning works

Furniture

Floor coating works

Building services insulation


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.