IPA - Integrated Project Alliance

3 Schools Bremerhaven

As a flagship educational project, three new schools are currently being built in Bremerhaven. In these so-called cluster schools, individual concepts specifically tailored to the learning needs of children are being implemented and tested. The new buildings provide modern learning environments designed to foster a positive learning atmosphere.

A wide range of products, systems, and bespoke solutions from the Lindner Group are being utilised. Flush-mounted glazing and glass partition walls not only ensure maximum light transmission but also create striking visual accents. To optimise room acoustics, Lindner Plus Acoustic Metal absorbers and various MUTE+® ceiling absorbers are being used. Efficient lighting from the Lindner lighting factory guarantees optimal illumination of the spaces, complemented by custom-made wooden doors and individually designed furniture, which round off the overall picture.

In the field of technical building services, a comprehensive range of measures is being implemented, including the installation of sanitary, heating, and ventilation systems, as well as telecommunications and electrical systems. Special attention is being given to building automation, which is being implemented according to the latest technological standards.

For the facade design, Lindner relies on a combination of timber-aluminium windows and post-and-beam facades, which have been specifically planned for the project. This is complemented by aluminium windows, aluminium sheet cladding, and fixed shading elements made from bespoke aluminium profiles.

The project operates under an IPA (Integrated Project Alliance), bringing together a total of eight alliance partners, making it the first of its kind in Germany involving the public sector in building construction. To enhance collaboration further, a joint lean management approach and the specially developed planning tool Metronom are being employed. Metronom, developed by Lindner and tibe.io, enables efficient scheduling and improves communication among the project participants.

General

Project: 3 Schools Bremerhaven

Building Type: Schools

Address: Melchior-Schwoon-Straße 2

Zip/City: 27576 Bremerhaven

Country: Germany

Completion: from 2021 to 2025

Company: Lindner SE | Building services engineering, Lindner SE | Fit-Out North.Northwest Germany, Lindner Building Envelope GmbH


Products

General Contracting

Sound absorber

Furniture

Carpentry

Partitions

Accessories - Lindner Plus

Partition Systems Glass

Doors

Wooden doors

Luminaires

Light channels

15 Pcs.

System luminaires for metal ceilings

656 Pcs.

2074 Pcs.

Surface mounted luminaires for walls / ceilings

118 Pcs.

Downlights

543 Pcs.

Building services engeneering

Sanitary work

Heating supply systems

Ventilation systems

High Voltage Engineering Services

Communication and information technology systems

Lift installations

Building automation system


Architect

gmp Architekten von Gerkan, Marg und Partner


Client

Städtische Grundstücksgesellschaft mbH unterstützt durch Bremerhavener Gesellschaft für Investitionsförderung und Stadtentwicklung mbH


Specialist Planner for supporting Structure

WTM Engineers GmbH


Specialist Planner HVAC

Pfeil und Koch Ingenieurgesellschaft GmbH & Co. KG


Execution of extended shell construction

Aug. Prien Bauunternehmung GmbH & Co. KG


230329_NOL_Aussen
230310_SHS_Aussen
NGL_Aussen
230309_SHS_Cluster
230413_SHS_Foyer_2

References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.