Multiclean CPH 448

Suspended, two-part glazing system as balustrade or full glazing

Clean room glazing consisting of two aluminium frames with glued-on panes. The panes are flush with the aluminium frame so that only the adhesive surface behind them is visible. The elements are hooked into the stud work and the element joints are sealed according to clean room requirements.

  • highest flexibility
  • GMP-compliant

Downloads

Downloads

Digital Service

Tender texts and DIN/VOB specifications

Product Information

Dimensions
Technical Details
Acoustics
Static
Additional equipment
Project solutions

Don't hesitate to contact us!

Combinable Systems - (1)

Areas of Use

Healthcare: Clinics and Hospitals, Operating Theatres, Pharmacies (Production), Clean rooms ( pharmacy and medical technology)

Education: Research Rooms

Industry: Laboratories and Research Facilities, Clean rooms (electronics and semiconductor technology)

References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.