The new ADAC headquarters accommodates 2,400 employees who were previously spread across six different locations in Munich. The 18-storied office tower rises above the 5-storied base. The new building includes conference facilities and a training center, a staff restaurant, a print shop and office space. Lindner equipped the entire building with floor systems, predominantly the NORTEC raised floor system on an area of 44.000m².
Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.