Airport Geneva

To improve the reception of passengers on intercontinental flights and meet current standards, Geneva Airport's long-haul terminal from 1975, which was supposed to be only provisional, was replaced by a new pier, the so-called ‘East Wing’. Designed for wide-bodied aircraft and connections outside the Schengen area, the east wing helps to strengthen the airport's international presence. The new handling areas have a modern infrastructure and improved security for flight operations.

Lindner SE's Swiss branch in Opfikon supplied and installed various floor systems in the so-called “Aile Est”. Covering almost 13,000 m², the FLOOR and more® hollow floor system provides space for important installations and cables, as well as effective fire and smoke protection. The NORTEC raised floor made of calcium sulphate also ensures a high load-bearing capacity and excellent sound insulation. All Lindner flooring systems installed have a Cradle to Cradle Certified® Silver certificate and therefore support the sustainable construction of the building with circular products.

img-ch-flughafen-genf-1
img-ch-flughafen-genf-2
img-ch-flughafen-genf-3
img-ch-flughafen-genf-4

General

Project: Airport Geneva

Building Type: Airports

Address: Voie-des-Traz 34

Zip/City: 1215 Geneva

Country: Switzerland

Completion: from 2019 to 2021

Company: Lindner SE | Branch Opfikon Switzerland


Companies involved

Architect: RSHP

Client: HRS Real Estate AG


Products

Floors

Calcium sulphate panels

12913 sqm

Calcium sulphate panels

2153 sqm


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.