To improve the reception of passengers on intercontinental flights and meet current standards, Geneva Airport's long-haul terminal from 1975, which was supposed to be only provisional, was replaced by a new pier, the so-called ‘East Wing’. Designed for wide-bodied aircraft and connections outside the Schengen area, the east wing helps to strengthen the airport's international presence. The new handling areas have a modern infrastructure and improved security for flight operations.
Lindner SE's Swiss branch in Opfikon supplied and installed various floor systems in the so-called “Aile Est”. Covering almost 13,000 m², the FLOOR and more® hollow floor system provides space for important installations and cables, as well as effective fire and smoke protection. The NORTEC raised floor made of calcium sulphate also ensures a high load-bearing capacity and excellent sound insulation. All Lindner flooring systems installed have a Cradle to Cradle Certified® Silver certificate and therefore support the sustainable construction of the building with circular products.
Project: Airport Geneva
Building Type: Airports
Address: Voie-des-Traz 34
Zip/City: 1215 Geneva
Country: Switzerland
Completion: from 2019 to 2021
Company: Lindner SE | Branch Opfikon Schweiz
Architect: RSHP
Client: HRS Real Estate AG