EfW Boden

Bodens Energi AB expanded its existing plant in Boden with a new waste-fired CHP line (P18) with a thermal capacity of 35 MW. The P18 line was integrated into the existing plant and housed in a new, separate building.
Lindner insulated the boiler, ducts and piping over an area of 5,900 square metres.

img_se_efw_boden_2
img_se_efw_boden_8
img_se_efw_boden_3
img_se_efw_boden_7

General

Project: EfW Boden

Building Type: Power Plants

Address: Degerbergsvägen 2

Zip/City: 961 36 Boden

Country: Sweden

Completion: 2018

Company: Lindner Isoliertechnik & Industrieservice GmbH


Companies involved

Client: Bodens Energie AB


Products

Insulation Engineering

5900 sqm


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.