Bodens Energi AB expanded its existing plant in Boden with a new waste-fired CHP line (P18) with a thermal capacity of 35 MW. The P18 line was integrated into the existing plant and housed in a new, separate building.
Lindner insulated the boiler, ducts and piping over an area of 5,900 square metres.
Project: EfW Boden
Building Type: Power Plants
Address: Degerbergsvägen 2
Zip/City: 961 36 Boden
Country: Sweden
Completion: 2018
Company: Lindner Isoliertechnik & Industrieservice GmbH
Client: Bodens Energie AB
Insulation Engineering
5900 sqm