Eurotheum

The Eurotheum is a 110 meter high-rise in Frankfurt city center. The first 21 of the 31 floors offer 17,000 m² of office space. From the 22nd to the 29th floor, a hotel with 74 apartments, meeting rooms and a bar occupies the Eurotheum. When the anchor tenant, the European Central Bank, left the building at the end of 2014, it was possible to redesign the interior.

Lindner had been involved in the fit-out and redevelopment of the building twice before. In the spring of 2015, two exemplary floors were created for the client, after which Lindner was commissioned at the end of 2015 with the demolition and subsequent tenant development of 20 floors. At the beginning, dismantling and demolition work was carried out, followed by the basic construction of the building core on floors 1 - 21. Following this, tenant fit-out was carried out over 20 floors. This includes all interior fit-out works, including glass partitions of the Lindner Life Stereo 125 type. Some of these works needed to be executed during normal operation of the building, which required additional measures in the project management. The highlight came with the redevelopment of the foyer, whose walls were covered with high quality all-glass light walls up to a height of 24 m. The hollow floor FLOOR and more® power was extensively installed there and covered with natural stone. As in this area, Lindner was responsible for the execution of all fit-out works up to final cleaning in the adjacent low-level building on floors 1-5. The following architects were involved in the reconstruction: Canzler GmbH, Frankfurt a. M. (basic construction); Just Burgeff Architekten GmbH (tenant fit-out); Peter Kulka Architecture Cologne GmbH (foyer and liftlanding fit-out).

img_de_eurotheum_3
img_de_eurotheum_5
img_de_eurotheum_7
img_de_eurotheum_9

General

Project: Eurotheum

Building Type: Office buildings, Hotels and Resorts

Address: Neue Mainzer Str. 66

Zip/City: 60311 Frankfurt

Country: Germany

Completion: from 2015 to 2017

Company: Lindner SE | Fit-Out Central.East Germany, Lindner SE | Partitions, Lindner SE | Floors


Companies involved

Client: Commerz Real AG


Products

General contractor

Demolition works

Painting works

Floor covering works

Tiling works

Metalworks

Cleaning works

Natural and artificial stone works

Dry lining

Plasterboard ceiling systems

Plasterboard partition systems

Floors

Calcium sulphate panels


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.