JLR Statement Site

With the newly built "Statement Site" in the south of Munich, Jaguar Land Rover opened its largest car dealership worldwide. The building is divided into five levels with a total area of approx. 20,000 m², of which approx. 4,700 m² serve as exhibition space for current and also historical models of the two British premium brands. A total of around 100 vehicles are on display at the Statement Site. The second important pillar of the car dealership is the service area, which extends over two basement levels. Here, customers can enjoy an innovative service concept with a drive-through area, in which the full range of services is provided with 16 lifting platforms. The sustainable overall concept of the building has been awarded a BREEAM Excellent certification. The approx. 300 m² "Green Wall" in the exhibition area and the 15 quick-charging columns for cars with electrified drive are examples of this concept. The operation of the JLR Statement Site is the responsibility of the Bierschneider-British-Cars Group with approximately 70 employees on site.

Lindner SE was responsible for the implementation and coordination of numerous interior fit-out works in two construction phases, thus contributing to the high-quality design of the exhibition and service areas. The Lindner Group's product range was featured in the form of hook-on ceilings and plasterboard ceilings with integrated heating and cooling technology, which ensure efficient temperature control of the areas and at the same time contribute to the sustainable building concept. In addition, Lindner glass partition walls create spatial separation while maintaining a high level of transparency to facilitate confidential customer consultations. 

img_de_jlr_statement_17
img_de_jlr_statement_20
img_de_jlr_statement_12
referenzen_JLR--_3_
img_de_jlr_statement_26

General

Project: JLR Statement Site

Building Type: Exhibition, Business premises, Building certification

Address: Drygalski Allee 37

Zip/City: 81477 Munich

Country: Germany

Completion: 2019

Company: Lindner SE | Fit-Out South.Southwest Germany

Gebäudezertifizierung: BREEAM


Companies involved

Client: Jaguar Land Rover Deutschland GmbH

Architect: Hamacher, Daub & Partner

Architect: Fischer Architekten GmbH


Products

Partitions

150 Running meter

Ceilings

500 sqm

Heated and Chilled Plasterboard Ceilings

150 sqm

Doors

Wooden doors

103 Pcs.

Floor covering works

Locksmith works

Carpentry

Tiling works

Painting works

Floor coating works

Insulation Engineering

Plasterboard ceiling systems

Plasterboard partition systems

11750 sqm

1100 sqm


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.