New Elbe Tunnel 1, 2 and 3

Due to abrasion to, and weathering of, asbestos components, the risk of asbestos dust was increased. Renovation measures were therefore put
in place. As a certified specialist to TRGS 519, we removed the sprayed asbestos from the tubbing segments and replaced the fire protection materials. So as not to disrupt the motorway traffic for too long, we carried out all services in multiple shifts.
img_de_elbtunnel_15
img_de_elbtunnel_9
img_de_elbtunnel_10
img_de_elbtunnel_12
img_de_elbtunnel_14

General

Project: New Elbe Tunnel 1, 2 and 3

Zip/City: 20355 Hamburg

Country: Germany

Completion: from 2003 to 2011

Company: Lindner Isoliertechnik & Industrieservice GmbH


Companies involved

Client: Freie Hansestadt Hamburg


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.