Reconstruction Scharr Headquarters LK50

Friedrich Scharr KG has completely rebuilt its headquarters in Stuttgart: In the course of the LK50 construction project, an innovative office concept with spacious lounge and communication areas was created for the approximately 140 employees. This involved a redistribution of the rooms – away from the interlocking individual rooms and corridors from the 1970s and towards open, flexible office spaces.

The Lindner Group was responsible for the complete interior fit-out and revitalisation of the work areas. For the floor, the FLOOR and more® variant was chosen, a particularly resilient system that impresses with a high level of walking comfort, non-combustibility and optimised acoustics. If you look upwards, you will discover the LMD lamella ceiling and the Plafotherm® heated/chilled ceilings. The AirBox air supply elements also ensure a pleasant supply of fresh air in the office rooms. For elegant room partitioning, Lindner installed various partition wall systems, including the Lindner Logic 100 Timber wooden partition wall and the Lindner Life Pure 620, Lindner Life Clear and Lindner Life Stereo 125 glass partition walls. A special highlight is the Lindner Life Fire fall-proof glazing in F90, which was designed as an impressive interior façade. The interior fit-out was supplemented by various door elements, wall claddings and drywall.

img-de-scharr-lk50-stuttgart-5
img-de-scharr-lk50-stuttgart-8
img-de-scharr-lk50-stuttgart-7
img-de-scharr-lk50-stuttgart-4

General

Project: Reconstruction Scharr Headquarters LK50

Building Type: Administration Buildings

Address: Liebknechtstraße 50

Zip/City: 70565 Stuttgart

Country: Germany

Completion: from 2020 to 2022

Company: Lindner SE | Fit-Out South.Southwest Germany


Companies involved

Architect: SCD Architekten Ingenieure GmbH

Construction Management: Friedrich Scharr KG


Products

Ceilings

Baffle Ceilings

275 Running meter

Heated and Chilled Baffle Ceilings

467 Running meter

1689 sqm

Ventilation Components

125 Pcs.

Floors

Calcium sulphate panels

2600 sqm

Partitions

450 sqm

100 sqm

275 sqm

Partition Systems Full Panel

450 sqm

Dry lining

Plasterboard partition systems

250 sqm


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.