Kulturpalast

Since 1969, the Kulturpalast of Dresden has been one of the most destinctive cultural establishments of the GDR and stayed the most important venue of the city even after the German reunification. After 40 years of use, the "Kulti" closed in 2012 on the occasion of a complete modernisation and redevelopment.

Lindner AG was responsible for the fit-out and the coordination of all works incl. building services and stage equipment of the concert hall, the cabaret hall as well as for the restauration of the heritage-protected Mogi Ceiling in the Foyer. What followed was an immediate involvement in the project right after the closure of the contract, where Lindner carried our the complete production and installation planning as well as the engineering in 3D models for the concert hall. As a preparation for the redevelopment, Lindner Gerüstbau GmbH was contracted with the construction of 21.500 m³ of complex scaffold structures. Within 18 days, about 110 tonnes of scaffolding material have been installed under sophisticated circumstances. The steel substructure of the hall was cladded with specially-folded triangular gypsum fibre panels. As to the walls, both gyspum fibre systems and fire protection claddings with real-wood veneer of type FIREwood have been installed. The floor system of choice was the specialised FLOOR and more® arena. The ground floor houses a completely decoupled cabaret hall, for which Lindner developed an acoustically effective expanded metal wall and ceiling cladding and supplied further ceiling claddings as well as custom doors. The contract for the faithful restauration of the monolithic gypsum ceiling (Mogi) in the foyer could be put into practice thanks to the finding and further development of original templates.

img_de_kulpa_5
img_de_kulpa_13
img_de_kulpa_8
img_de_kulpa_18
img_de_kulpa_22
img_de_kulpa_27

General

Project: Kulturpalast

Building Type: Function rooms, Concert Halls

Address: Schloßstraße 2

Zip/City: 01067 Dresden

Country: Germany

Completion: 2017

Company: Lindner SE | Fit-Out Central.East Germany, Lindner SE | Interior Fit-Out and Furnishings


Companies involved

Client: Kommunales Immobilienmanagement Dresden

Architect: gmp Architekten von Gerkan, Marg und Partner


Products

Floors

Calcium sulphate panels

1900 sqm

Calcium sulphate panels

300 sqm

Ceilings

250 sqm

Partitions

Wall and ceiling panels

3150 sqm

Doors

Wooden doors

300 Pcs.

General Contracting

Furniture

Plasterboard ceiling systems

Plasterboard partition systems

Other design services

Construction site equipment

Scaffolding works

Carpentry

Locksmith works

Painting works

Floor covering works

Steel construction works

5400 sqm

1900 sqm


References

Our Projects worldwide

Once around the globe and back again to our home Arnstorf: With our construction projects we are represented almost everywhere! No matter whether new construction or renovation, whether interior fit-out, building envelope or insulation – our references consist of a colourful mixture full of new challenges and impressive results.